Announcements, releases and milestones from across the platform.

A diagnostics specialist argues the answer to earlier fire detection is not more sensors but reading the thousands of measurements a battery management system already collects.

158GW and 459GWh of new non-pumped-hydro storage is projected for this year, after 2025 closed at 112GW and 307GWh, with the fastest growth outside the established markets.

The 2026 edition expects a hazard mitigation analysis for most installations rather than only for oversized ones, and adds installation-level fire testing alongside UL 9540A.

Member states are asked to refrain from fining importers for three years from 2027, while the monitoring, reporting and verification duties themselves stay exactly where they are.

The In-Sight 3900 runs inspections up to four times faster at resolutions to 25 megapixels, standalone, with no external industrial PC in the cabinet.

The new streaming protocol lets a camera write directly into host memory without operating-system involvement, targeting 400G-class links while keeping GenICam and backward interoperability.

38,000 units were installed in 2025, an 11% rise, lifting US robot density to 307 per 10,000 manufacturing employees — still a quarter of South Korea's.

The 9604 puts L-band satellite, LTE-M and multi-constellation positioning into 16 by 26 mm, on a footprint device makers already have tooling for.

1,140 incidents involving industrial organisations were recorded in Q2 2026, with manufacturing accounting for 65% of them and Germany's count nearly doubling.

Over two days in July, controllers from three vendors were manipulated into pressure loss, flooding and forced manual operation, with related incidents reported in at least twelve states.

Joint advisory AA26-231A describes exploitation scripts disguised as OT monitoring tools, riding the S7comm protocol on TCP port 102 to reach memory, configuration and ladder logic.

Ireland, Spain, France and the Netherlands face a lump sum and daily penalties for failing to notify complete transposition, nearly two years after the deadline.
Tell us what you're building and we'll help you scope the first deployment.