Announcements, releases and milestones from across the platform.

Two new radio units — one for the European 3.8 to 4.2 GHz local-industrial band and a US CBRS unit — take the system to 15 countries, with American availability in summer 2026.

Portwell has built Core Ultra 200S Series processors into industrial edge platforms aimed at AI inference, part of a broader move to put usable model capacity in cabinet-mounted hardware.

The case being made is convergence rather than speed: one physical network carrying control traffic, video and analytics without the first being disturbed by the others.

Switches from Cisco, Belden, Moxa and Siemens are in the field and OPC UA PubSub over TSN has reached production pilots, but scheduling is still configured through each vendor's own engineering tool.

Analysts describe a shift from training scale to inference placement, on the argument that the data that most needs a fast decision is generated at factories, retail sites and remote installations.

The ProLinx Edge Gateway runs compact inference models, digital twin connectivity agents and analytics containers alongside protocol translation in a single device rated for harsh environments.

Analysts now track scheduling and orchestration software for mobile robots separately from the robots, a sign that the layer has become a purchasing decision rather than a bundled feature.

Adoption has moved past the pilot stage, and the reported bottleneck is shifting from the robots themselves to the software that schedules them.

Published estimates for the 2026 autonomous mobile robot market run from USD 2.75 billion to USD 5.49 billion, a spread that says more about definitions than about disagreement.

Analysts are warning that the high-risk deferral is being read too broadly. Article 50 transparency obligations and the Article 4 AI literacy duty are unchanged and already apply.

The second half of the AI Act deferral gives Annex I products — machinery, medical devices, lifts, toys and other CE-marked goods with AI inside — a twelve-month extension to 2 August 2028.

The Digital Omnibus on AI entered into force on 27 July 2026, moving the compliance deadline for stand-alone Annex III high-risk systems from 2 August 2026 to 2 December 2027.
Tell us what you're building and we'll help you scope the first deployment.